My to-do list

Posted by Ashley Knowles | Posted in Systems Administration | Posted on 20-10-2009

Tags: , , , , , , , ,

0

  1. Play around with WinPE3.0 (aka Windows 7 Pre-installation Environment) http://blog.brianleejackson.com/winpe-3-0-boot-environment-scripts
  2. Get my eyes tested!
  3. Upgrade www.cruisingbrisbane.com to latest version of Invision Power Board, and re-design the front page…
  4. Re-install radiator and hoses in the S15
  5. Fabricate mount for coilpacks in the S15
  6. Re-wire MSD DIS4 ignition in the S15
  7. Get tailshaft fabricated for the S15 by Driveline Services @ Archerfield
  8. Source mandrel bent exhaust pipe (3.5″ and 3″) to complete the exhaust on the S15
  9. Install oil cooler, oil filter relocation block and all the lines with it in the S15
  10. Tune the Haltech PS1000 in the S15
  11. Drive the S15

Clearly, these are arranged in ascending priority…

8 visitors online now
8 guests, 0 members
Max visitors today: 9 at 12:24 pm GMT-10
This month: 49 at 03-02-2010 09:52 am GMT-10
This year: 49 at 03-02-2010 09:52 am GMT-10
All time: 49 at 03-02-2010 09:52 am GMT-10